Portfolio - Dam Removal
Back to Portfolio
Dam Removal - Underwater Wire Sawing
![Dam Removal Dam Removal](/upload/images/portfolio/2017-04-25-12.52.24.jpg) Before cutting
![Dam Removal Dam Removal](/upload/images/portfolio/2017-07-26-16.26.30.jpg) Pullies guide the diamond wire to the bottom of the piers; approximately 14 feet below the surface of the water.
![Dam Removal Dam Removal](/upload/images/portfolio/2017-07-26-16.26.24.jpg) One of three divers used on the project.
![Dam Removal Dam Removal](/upload/images/portfolio/2017-07-14-15.37.29.jpg) Debris found and cut through the piers.
|